Evaluation
R. Siarot
Grading Rubric
|
|
Foreman (4) |
Journeyman (3) |
Apprentice (2) |
Trainee (1) |
Score |
|
Detail Built to
Given Specifications |
Bridge was built to given specifications. Length, span, substructure, and
superstructure are exact measurements |
Bridge built mostly to specifications. A one inch or less miscalculation
(plus/minus) in final structure |
Bridge built partly to specifications. A 1 to 2 inch miscalculation
(plus/minus) in final structure |
Bridge not built to specifications. More than 3 inches were (plus/minus)
in final structure |
|
|
Neatness Built
neatly and
professionally |
Bridge built neatly. There are no laminated areas, and
joints are clean and well-fitted |
Most of the bridge is built neatly. There are few (less than 4) laminated
areas, and joints are mostly clean and well-fitted |
Bridge is built somewhat neatly. There are 5-8 laminated areas, and
joints are somewhat clean. Joints
are not well fitted |
Bridge is not built neatly. More than 8 areas are laminated. Joints are cut crooked and do not fit
right |
|
|
Labor Group
cohesiveness and teamwork |
Group worked together and each person carried out
their role and responsibilities to complete the bridge |
Group worked together most of the time. Fewer than 3 reminders to stay on task
needed to be given for the group |
Members of the group rarely carried out their
assigned roles. Group needed 3
– 7 reminders to stay on task |
Members of the group did not carry out their
assigned roles. Group needed more
than 7 reminders to stay on task |
|
|
Time Completed project within given timeline |
Project completed in the given amount of time or
less. |
Project completed 1 day over the project deadline |
Project completed 2 days over the project deadline |
Project completed more than 2 days over the project
deadline |
|
|
Materials All
materials given were used and accounted for; Work area clean and neat |
All materials were used to complete the bridge and
there was no waste. Work area
clean and neat at the end of construction |
Most materials were used to complete the bridge and
there was some waste. Work area
somewhat clean and neat at the end of construction |
Lots of materials (up to 12”) of wood wasted
in the bridge construction. Work
area messy. Students cleaned area
after 1 reminder |
Lots of materials (over 12”) of wood wasted in
the bridge construction. Work
area is messy. Area still messy
after reminder |
|